Quick Facts

Facts about Marshall Business Park

  • Marshall Business Park - large amount of infrastructure in place such as: sewer, potable water, utility services, and rail service.
  • Strong and quality work force.
  • Education opportunities range from progressive public schools to 9 institutions of higher learning with in 40 minutes of Marshall.
  • TSTC Campus in Marshall offers technical training at their facility or industry site
  • We offer small town friendliness with lots of big city amenities.
  • We have 250acres available

A site with a 80,000 square foot building pad ready for use.
Marshall Business Park offers easy access to interstates or Major Highway

  • Distance from Highway 59 North to Loop 390 Entrance - 2.6 miles
  • Distance from Interstate 20 & Hwy 59 to Loop 390 Entrance - 8 miles
  • Distance from Highway 80 to Loop 390 Entrance – 1.6 miles
  • Distance from Loop 390 - .4 miles

Infrastructure

  • 10” inch sewer line throughout Business Park
  • 12” inch water line potable water
  • Gallons per minute
  • Minimum flow 1400 gallons per minute
  • Mininum static pressure 65 psi and residual pressure 40 psi
  • Fire class rating: Class 5

Rail Service

  • Rail service is available in phase one and will be available in phase two on the main line of Union Pacific Rail Service.

Soil

  • Soil borings are available for most areas in the Marshall Business Park
  • No unusual characteristics
  • No adverse soil conditions
  • Most cases ideal soil conditions
  • Located native iron ore gravel which makes ideal road and parking lot base material

Marshall Business Park Industries

Assmann Corporation - Marty Lewis - 3 Employees                                                            Amour Swift Meat Co.-Steve Butler - 5 Employees
Black & Decker- Dion Faucheux- 89 Employees
D K Industries – Don Knutson - 7 Employees
Eltec – Bill Marshall - -30 Employees
East Texas Plating – David Rutledge - 9 Employees
Longview Asphalt – Micheal Harragan - 4 Employees  

MECAR - Steve Dart - 15 Employees
Sonco-Brad Smith-   

Titan Dynamics - Dare Westmoreland - 27 Employees  

Quality Culvert - Mike Adam - 4 Employees

Weatherford Artifical Lift Systmes, Inc.-

Total = 193 employees in the Marshall Business Park